Ask a New Question

Question

A spring is stretched by a 40mm by a force of 10 newton.what is the work done by the force
6 years ago

Answers

Damon
10 N = k * 0.040 meters
so
k = 10/.04 =1 Newton / .004 meter

Work done = potential energy gained = (1/2) k x^2
= (1/2)(1/.004)(.04)(.04) Joules
6 years ago

Related Questions

A stretched spring with k=21.6 N/m is pulling with a force of 1.5 N. How much work was done to stre... A spring is stretched by 0.72 m from its orginal length with an external force of 10.5. What is the... A spring is stretched by 8 cm when a force of 2 N is applied. If a force of 5.8 N is applied, how ma... A spring is stretched 40mm by force 15N, what is the work done by the force?? A spring is stretch 40mm by a force of 15N ...what's the work done A spring is stretched 40mm by a force of 15N.Calculate the workdone by the force(physics) A spring streted 40mm by a force of 15N . when is the work done of the force A spring is streched 40mm by a force of 15 newton, what is the work done. a spring is stretched 0.04m by a force of 15n. Calc the workdone by the force 1. If a spring is stretched to 0.17 m away from the equilibrium point and the total potential energy...
Ask a New Question
Archives Contact Us Privacy Policy Terms of Use