Ask a New Question
Search
How much work is done in lifting 450 lb of cement 75 ft above the ground?
So basically its W=fs
(450lb)(75ft)=33750lb
Ask a New Question
or
answer this question
.
Similar Questions
A worker on scaffolding 75 ft above the ground needs to lift a 500 lb bucket of cement from the ground to point 30 ft above the
1 answer
Which requires more power? lifting a 25 kg bag of cement 10 m vertically in 1 minute, or lifting a 50 kg bag 5?
1 answer
A worker on scaffolding 65 ft above the ground needs to lift a 390 lb bucket of cement from the ground to a point 20 feet above
1 answer
A worker on scaffolding 75 ft above the ground needs to lift a 410 lb bucket of cement from the ground to a point 25 feet above
0 answers
more similar questions