A worker on scaffolding 65 ft above the ground needs to lift a 390 lb bucket of cement from the ground to a point 20 feet above the ground by pulling on a rope weighing 5 lb/ft. How much work is required?

1 answer

integrate(390+5x)from 45 to 65