the volume of the first hole is 2x2x2 or 8 cubic feet
so his rate is 9 cubic feet/hour
the second hole is 4x4x4 or 64 cubic feet.
so if he can dig 8 cubic feet in 1 hour, how many hours do you think it would take him to dig 64 cubic feet?
A landscaper dug holes. It takes him 1 hour to dig a hole 2 feet deep, 2 feet long and 2 feet wide. Assuming everything remains the same, how many hours would it take him to dig a hole 4 feet deep, 4 feet long and 4 feet wide?
5 answers
I am confused.
You said in your first statement that his rate is 9 cubic feet/hour. But you also state that he can dig 8 cubic feet in 1 hour.
I am assuming that if he can dig 8 cubic feet in 1 hour that it would take him 8 hours to dig 64 cubic feet. (64 cu. ft divided by 8 cu. ft.) Correct?
You said in your first statement that his rate is 9 cubic feet/hour. But you also state that he can dig 8 cubic feet in 1 hour.
I am assuming that if he can dig 8 cubic feet in 1 hour that it would take him 8 hours to dig 64 cubic feet. (64 cu. ft divided by 8 cu. ft.) Correct?
clearly a typo,
yes, you are right, it would take 8 hours.
yes, you are right, it would take 8 hours.
Thank you Dr. Reiny.
50 feet long and 30 feet wide with 9 feet tall, what is the volume of the interior of the second floor