a 2199 kg pile driver is used to drive a steel beam into the ground. the pile driver falls 8.8 m before contacting the beam, and it drives the beam 19 cm into the ground before coming to rest. using energy considerations, calculate the average force the beam exerts on the pile driver while the pile driver is brought to rest.
9 years ago

Answers

S
998114 N
9 years ago

Related Questions

the hammer of a pile driver weighs 3800N and must be lifted vertically 2.80 m at constant speed in 4... A pile driver pounds a steel column into the ground. On the first drive, the column is pounded 1.65... A 2,300-kg pile driver is used to drive a steel I-beam into the ground. The pile driver falls 3.00 m... A pile driver of mass 1000kg,hits a post 3m below it.It moves the post 10mm.Assuming gravity=10m/s,w... The pile driver struck the piling with a speed of 20 m/s. At what height did the pile driver hammer... A pile driver falls a distance of 1.75 m before hitting a pile. Find its velocity as it hits the pi... Suppose the 480 lb pile driver that drops 20 ft drives the pile 2 in. every time it strikes the pile... Suppose the 480 lbs pile driver that drops 20 ft drives the pile 2.0 in. every time it strikes the p... A pile driver lifts a 450 kg weight and then lets it fall onto the end of a steel pipe that needs to... A pile driver of mass 125kg falls through a height of 80m before striking the pile. What is it's mom...
Ask a New Question
Archives Contact Us Privacy Policy Terms of Use