The next step Jouri needs to take is Option #1: Using a compass, measure the distance between point P and point W.
This is because to construct a copy of segment PT using point W as one of its endpoints, she first needs to determine how far point P is from point T. Once she measures the distance from P to T (which she will replicate) using point W, she can then place the other endpoint (T) at the correct distance from W to complete the construction.