Question
How much work is needed to raise a 110-kg load of bricks 12 m above the ground to being under construction?
work in joules= weight*height
where weight is mass*9.8m/s^2
work in joules= weight*height
where weight is mass*9.8m/s^2
Answers
Related Questions
How much work is needed to raise a 110-kg load of bricks 12m above the ground to a building under co...
A construction hoist does 2.74x10⁴J of work in lifting a load of bricks from the street to the roof...
A 1500 W winch is used to raise a load of bricks to a height of 25m. If the bricks need to reach t...
A block and tackle of 6 pulley is used to raise a load of 30N steadily through a height of 3m. If t...