Ask a New Question
Search
How much work is needed to raise a 110-kg load of bricks 12 m above the ground to being under construction?
work in joules= weight*height
where weight is mass*9.8m/s^2
Similar Questions
How much work is needed to raise a 110-kg load of bricks 12m above the ground to a building under construction?
According to the
0 answers
A 1500 W winch is used to raise a load of bricks to a height of 25m. If the bricks need to reach this height in 1.5 minutes.
1 answer
A construction hoist does 2.74x10⁴J of work in lifting a load of bricks from the street to the roof of a building. The roof is
2 answers
A block and tackle of 6 pulley is used to raise a load of 30N steadily through a height of 3m. If the work done against friction
1 answer
more similar questions