Ask a New Question

Question

A sled is dragged along a horizontal path at a constant speed of 1.5 m/s by a rope that is inclined at an angle of 30.0° with respect to the horizontal (the figure below). The total weight of the sled is 470 N. The tension in the rope is 240 N. How much work is done by the rope on the sled in a time interval of 15.0 s
12 years ago

Answers

Related Questions

A 16.3 kg block is dragged over a rough, horizontal surface by a constant force of 157 N acting at a... A 125-kg sled is dragged by a team of dogs a distance of 2 km over a horizontal surface at a constan... A sled is pulled across a horizontal snow surface with a constant velocity. The force being applied... A 14.8 kg box is being dragged 12.5 m across the floor using a rope held at a 32 degree angle from t... a 65 kg bag is dragged along a 12m ramp in order to get from the ground to the floor of the loading... a 65 kg bag is dragged along a 12m ramp in order to get from the ground to the floor of the loading... A 25 kg box is dragged across a floor by a rope that makes an angle of 60 degrees with the horizonta... A 11-kg box is dragged across a frictionless surface by a force F=55N. the box travels 4.0ft. what i... 8. Sarah has always dragged and dropped image files from her memory card or camera to a folder on... Dragged the characters to the country box Malaysia and East Timor Citizens vote in elections, but...
Ask a New Question
Archives Contact Us Privacy Policy Terms of Use