Millwood city is constructing a new highway through town. The construction crew can complete 5 3/6 miles of road each month. The total new highway will be 54 miles long. Will the highway be finished in 8 months?

I know that 36 2/5 miles of highway can be completed in 6 1/2 months but then I am lost from there

3 answers

54mi/(5.5mi/mo) = 9.8 mo
Nope.
thank u steve
What is the answer