Question
Complete in Metric Conversions:
Estimate the cost ($) of the concrete required to construct a concrete sidewalk shaped as shown on the board. The required depth of the concrete in the sidewalk is 4 inches and the concrete costs $105/cubic yard.
Estimate the cost ($) of the concrete required to construct a concrete sidewalk shaped as shown on the board. The required depth of the concrete in the sidewalk is 4 inches and the concrete costs $105/cubic yard.
Answers
Related Questions
A 4inch-thick concrete slab is being poured for a circular patio 14 feet in diameter. Concrete cost...
concrete costs 105 per cubic yard. plato is making a rectangular concrete garage floor measuring 33...
In Ali garden, he wants to build a concrete fountain. So he consults two different companies who pro...