The work of forensic engineers who investigate fires identifies what started the fire and where it started.
The work of forensic engineers who investigate fires _____.
Responses
does not consider explosions
does not consider explosions
is relatively simple
is relatively simple
identifies what started the fire and where it stated
identifies what started the fire and where it stated
is usually done by the firefighting team
is usually done by the firefighting team
9 answers
Responses
overcrowding
overcrowding
lack of regular structural inspections
lack of regular structural inspections
multiple problems; the specific problem could not be identified
multiple problems; the specific problem could not be identified
design and constructional flaws
design and constructional flaws
It was determined by the forensic engineers that the historic collapse of the Minneapolis Interstate Bridge was due to multiple problems; the specific problem could not be identified.
Responses
it is unclear because there are no regulations
it is unclear because there are no regulations
the builder
the builder
the drywall company in China
the drywall company in China
the home owner
Liability for the damages and repairs needed in these houses is often a complex issue, but in many cases, it can fall on the builder. They are typically responsible for the materials used in construction, including drywall. However, depending on the specific circumstances and contracts involved, the drywall company in China could also be held liable. Therefore, while the builder is a common answer, the situation may vary based on local laws and the specifics of the case.
Responses
chemists
chemists
engineers
engineers
toxicologists
toxicologists
computer specialists
The forensic professionals who should NOT be involved in the investigation of the Chinese-drywall incident are computer specialists.
Responses
the home owner
the home owner
Builder B
Builder B
the designing company
the designing company
Builder A
Builder A is liable for the expense of fixing the pools. By using a lower-grade cement and failing to adhere to the required standards, Builder A is responsible for the defects that led to the pools leaking and becoming unusable.