Question

Identify the Criteria and Constraints Name Identify the criteria, constraints and possible impact on humans and the environment. 1. You oversee building a footbridge that crosses a small stream. The footbridge must be able to hold the weight of ten people and be 2 meters across and 15 meters in length. The materials for construction must include recycled materials. Criteria: Constraints: Impacts: 2. You design a container that keeps a raw egg from cracking when it is dropped 20 feet. You can only use 5 materials in your construction, and you must complete your design and construction in 20 minutes. Criteria: Constraints: Impacts: 3. The city has decided to add a dog park to the city lot. It will need fencing, grass, a bench, a bag dispenser, a waste receptacle, and a sign with the rules for dogs and owners. The total cost needs to be under $25,000 dollars. Criteria: Constraints: Impacts:

Answers

GPT-4o mini
### 1. Footbridge

**Criteria:**
- Must support the weight of at least ten people simultaneously.
- Dimensions: 2 meters across and 15 meters in length.
- Must utilize recycled materials for construction.
- Should be safe and sturdy for pedestrian use.

**Constraints:**
- Limited budget for materials.
- Local building codes and regulations must be followed.
- Environmental impact must be minimized (e.g., construction disturbance near the stream).
- Time frame for construction.

**Impacts:**
- Potential changes to the stream ecosystem (e.g., habitat disruption).
- Increased human access to natural areas, encouraging outdoor activities.
- Encouragement of sustainable practices through the use of recycled materials.
- If improperly designed, risk of injury to users.

---

### 2. Egg Container

**Criteria:**
- Must prevent a raw egg from cracking when dropped from a height of 20 feet.
- Can only use a maximum of 5 different materials.
- Design and construction must be completed within 20 minutes.
- The container should be lightweight for easy carrying.

**Constraints:**
- Limited time for design and assembly (20 minutes).
- Limited number of materials (5).
- Materials must be accessible and feasible to use within the time frame.

**Impacts:**
- Development of critical thinking and problem-solving skills for individuals engaged in the task.
- Encouragement of innovation in using limited resources effectively.
- If successful, it may inspire educational projects related to engineering and physics.
- Waste generation if materials are not reused or recycled after the project ends.

---

### 3. Dog Park

**Criteria:**
- Must include fencing, grass, a bench, a waste dispenser, a receptacle for waste, and a rules sign.
- Total cost of the project must remain under $25,000.
- Environmentally friendly landscaping methods should be considered.
- The park should be designed for safety and accessibility.

**Constraints:**
- Maximum budget of $25,000, which limits material choices and design features.
- Space limitations of the city lot must be adhered to.
- Must comply with local regulations and zoning requirements.

**Impacts:**
- Provides a designated space for pet owners, improving community engagement.
- Potential positive impact on mental health and well-being for dog owners.
- Environmental impacts due to ground cover (e.g., turf vs. natural grass) and proper waste disposal.
- May lead to increased foot traffic, which could affect local wildlife and encourage responsible pet ownership.

---

These identified criteria, constraints, and possible impacts help in the project planning and decision-making process, ensuring that all factors are considered for successful completion.