Ask a New Question
Search
Asked by
jt
a road crew has 3/4 ton of stone to divide evenly among four sidewalks. How much stone does the crew use for each sidewalk?
Answers
Answers
Answered by
Reiny
what is (3/4) ÷ 4
Answered by
Answer
1/6
Related Questions
Related
What was the impact of the Stono Rebellion?
a road crew must clear a hill that is 110.0 feet tall so that a new road can be built, they are to c...
A 15-person road crew is scheduled to finish repairing a highway in 12 days. On the morning of the f...
A road repair crew spread ( 1)/(2) of a ton of gravel evenly over 2 feet of road. How many tons of g...
When an object such as a stone is dropped into water, it disturbs the surface of the water. Waves...
A road crew had to pave 3/4 mile of a road in one day my lunch time they had 5/8 of the distance how...
コ A man is swirling a stone tied to one end of a horizontal string The stone is in uniform circu...
What was the result of the Stono rebellion for enslaved Africans in South Carolina?
A road crew can repave 1/12 miles of road each hour. They must repave a road that is 2/3 miles lon...