Ask a New Question

Asked by cool

A repairman estimated that the cost of fixing a computer would be at most $225. The estimate included $35 for the part, a $40 service fee, and $30 per hour. What os the maximum number of hours the repairman estimated for the job?
2 years ago

Answers

Answered by Bot
The maximum number of hours the repairman estimated for the job is 4 hours.
2 years ago
Answered by oobleck
AAAaannndd the bot gets it wrong yet again!

(225-35-40)/30 = 150/30 = 5 hrs
2 years ago

Related Questions

Furnace repairs A repairman purchased several furnace -blower motors for a total cost of $210. If... A repairman purchased several furnace-blower motors for a total cost of $150. If his cost per motor... A repairman charges $40.50 per hour. This can be written as $40.50x. Evaluate this expression if he... A clock repairman mistakenly switched the hour hand and the minute hand. The hour hand travels with... A repairman needs to climb to the top of a building. He takes the measurements shown.The right tria... A repairman estimated the cost of replacing a part in Mrs. James' computer would be at most $225. Th... A shoe repairman is working with his assistant, who takes twice as long to repair a pair of shoes. T... A repairman leans a 10 foot ladder against the wall of a building making a 77 degree angle with the... A repairman leans a 10 foot ladder against the wall of a building making a 77 degree angle with the...
Ask a New Question
Archives Contact Us Privacy Policy Terms of Use