Question

A man will pay RM 46000 to renovate an office . If the construction materials cost 25% more and the labour costs 30% more , he will need to pay RM 58540. Find the original cost of the construction meterial and the cost of labour .(Used equation)

Answers

Chris
The cost of renovating the office consists of construction materials and labour costs.
So we let x and y be cost of construction materials and labour respectively.
This means x + y = 46000

If the materials are 25% more and labour 30% more, renovation costs are RM58540.
So our second equation is
125/100x + 130/100y = 58540

Now we have 2 equations so we can solve for both unknowns. :)