A 1100-kg elevator is lifted at a constant speed of 1.5 m/s through a height of 20 m.
Part A
How much work is done by the tension in the elevator cable?
Express your answer to two significant figures and include appropriate units.
Part B
How much work is done by gravity?
8 years ago

Answers

Related Questions

At 1100 K, Kp = 0.25 for the reaction 2SO2(g) + O2(g) equilibrium with 2SO3(g) What is the value o... 3.16. An 1100-kg car accelerates from 0 to 30 m/sec in 12 sec. If a frictional force of 200 N oppose... An elevator is being lifted up an elevator shaft at a constant speed by a steel cable. All fricional... At 1100 K, Kp = 0.25 for the following reaction. 2 SO2(g) + O2(g) 2 SO3(g) What is the value of K... An elevator is lifted up by a thick steel cable. While the elevator is moving upwards with a decreas... a 500 kg elevator is lifted 10. How much work was done a 50 j b 50 j /kg c 5000 j d 5000 j/kg... A 1100-kg elevator is lifted at a constant speed of 1.5 m/s through a height of 20 m. a)How much... An elevator lifted total mass of 1100kg a distance on 40m in 12.5s. How much power does the elevator... 45% of 1100 50x+50y=800 65x+75y=1100 solve for x
Ask a New Question
Archives Contact Us Privacy Policy Terms of Use