Asked by Angela
                It took 3 hoses 4 hours to fill the first 20,000 gallons in a swimming pool. Then a 4th hose was
added. If there was 15000 gallon left to fill, how long did it take?
            
        added. If there was 15000 gallon left to fill, how long did it take?
Answers
                    Answered by
            Steve
            
    assuming all the hoses have the same fill rate,
3 hoses fill 5000gal/hr, so that is 5000/3 gal/hr per hose.
now you know the hose fill rate, so multiply that by 4, and divide it into 15000gal.
    
3 hoses fill 5000gal/hr, so that is 5000/3 gal/hr per hose.
now you know the hose fill rate, so multiply that by 4, and divide it into 15000gal.