a) On the Acme W&W company production line, parts have to be transported 100 m by conveyor belt to a machine area. The parts move at a constant speed of 2.5 m/s. How much time does it take to move a part 100 m?
On the same conveyor belt as described in problem a), the part must slow down to 0.2 m/s over a distance of 0.9 m once it reaches the machine area. The original speed was 2.5 m/s. What is the average acceleration while slowing down? How much time does it take to slow down?
Show steps please!
Thank you!
On the same conveyor belt as described in problem a), the part must slow down to 0.2 m/s over a distance of 0.9 m once it reaches the machine area. The original speed was 2.5 m/s. What is the average acceleration while slowing down? How much time does it take to slow down?
Show steps please!
Thank you!