Question
A company manufactures two products. One requires 4.5 hours of labor, 13 pounds of raw materials, and costs $168.05 each to produce. The second product requires 6.5 hours of labor, 6 pounds of raw materials, and costs $121.35 each to produce. Find the cost of labor per hour and the cost of raw materials per pound. (Assume the same labor and raw materials are used in the production of these products.)
Answers
labor: $168.05/4.5hr + $121.35/6.5hr = $56.01/hr
do materials the same way
do materials the same way
Related Questions
. Making Product X requires 4,000 hours of labor and Product Y requires 6,000 hours of labor. TUV...
Amalgamated Furniture Company makes dining room tables and chairs. A table requires 8 labor-hours f...
A company manufactures two types of products, A and B. Each unit of Product A requires 3 hours of la...
A company manufactures two types of products, A and B.
Each unit of Product A requires 3 hours of...