Ask a New Question

Asked by Neil

At a certain construction site, there is a pile containing 55 tons of sand. Four trucks, each of which holds 11.4 tons of sand, are filled from this pile. How many tons of sand remain in the pile?
A. 9.4
B. 16.2
C. 20.8
D. 32.2
E. 43.6








11 years ago

Answers

Answered by Ms. Sue
55 - (11.4 * 4) = _______tons remaining

11 years ago
Answered by Neil
A. 9.4
11 years ago
Answered by Ms. Sue
Right.








11 years ago
Answered by Neil
Thank you very much Ms. Sue. You helped a lot.
11 years ago
Answered by Ms. Sue
You're very welcome, Neil.
11 years ago

Related Questions

At a construction site a pipe wrench struck the ground wiht a speed of 24 m/s. a) From what heig... At a construction site, a brick fell and hit the ground at 24m/s a) from what height did the bri... can anyone tell me a few site good for algebra 1a? Go to the web site for this text to find the total profit made by McDonald’s in 2002 At a construction site a pipe wrench struck the ground with a speed of 24 m/s. (a) From what height... What site could I go to, to find out about my horoscope? at a construction site a crane lifts a block of mass,m,vertically upwards through a height of 70 m a... At a construction site, 20,000 pounds of gravel are needed to create a driveway with an area of 400... 1) On the construction site an electric crane is used to lift materials to the 10th floor. A 180 kW... what is the best site for you to create a university hype video
Ask a New Question
Archives Contact Us Privacy Policy Terms of Use