ACTIVATED SLUDGE AND NUTRIENT REMOVAL =========================================== A wastewater treatment plant based on activated sludge with biological phosphate and nitrogen removal via pre-denitrification. The influent flow (dwf) is 30,000 m3/day and t...
11 years ago
Description A wastewater treatment plant based on activated sludge with biological phosphate and nitrogen removal via pre-denitrification. The influent flow (dwf) is 30,000 m3/day and the influent BOD concentration is 300 mg BOD/l. The suspended solid con...
11 years ago
QF Description Wastewater from a small town is treated in a trickling filter which is preceeded by a screen, sand-removal and primary clarification. The maximum hydraulic capacity, or peak flow, of the treatment plant is 1,500 m3/h. The dry weather flow (...
11 years ago
Answers
The following answers were posted by visitors named ham.
any one can answer this please?? thank you
11 years ago
thank you Anonymous i got already answer.
11 years ago
what answer you want pls?/
11 years ago
1.Screen>>coarse material 2. Grit chamber>>sand 3.Primary Sedimentation >>Suspended solid & settle able part of BOD 4.Anaerobic tank >>Hydrolysis of Xs & uptake of Ss 5.Anoxic tank >>Denitrification 6.Aerobic tank >>Nitrification 7.Final clarifier >>Separ...
11 years ago
mara i post some answer if you still around..
11 years ago
Question 3c What is the minimum size (volume) in m3 of the aeration tank? Calculate with a biomass concentration in the aeration tank of 4 g/l and take into account that the primary settler removes 33% of the BOD. Answer =10050
11 years ago
Question 3d What would be the size (volume) in m3 of the anaerobic tank (don’t forget the sludge recycle flow to the anaerobic tank)? Answer =1875
11 years ago
Question 3e What would be the waste activated sludge (or surplus sludge production) in kg dry weight per day? 1. Calculate the biomass production assuming all BOD entering the biological process is removed. Also add the primary sludge production, but for...
11 years ago
i will be here another couples of hours if any one looking for other answer pls paste me here Urgent...
11 years ago
Which number is the solution of m + 90 = 150? A. 50 B. 60 C. 140 D. 240
4 years ago
thanks
4 years ago
nothing
4 years ago
me ham
4 years ago
ham soo cool
4 years ago
fart on mrs sue
4 years ago
0.08-
4 years ago
20. The value of (39 × 5) on simplifying using the distributive property will be equal to 195. Given: The given expression is equal to (39 × 5)
2 years ago
21.The student instead of adding the 28 put them with negative sign making him withdraw from ten 375 instead of adding, that was his mistake.
2 years ago