Ask a New Question
A contractor supplied a number
A contractor supplied some items to a school. The contractor's bill is shown below. If each amount includes 5% VAT calculate how
1 answer
asked by
Charles
512 views
A contractor supplied some items to a school. The contractor's bill is shown below. If each amount includes 5% VAT calculate how
1 answer
asked by
Frank ch
657 views
A contractor supplied some items to a school.The contractor bill is shown below.If each amount includes 5%VAT,calculate how much
1 answer
asked by
david t
694 views
A contractor supplied a number of computer to a schools. If the total bill is 252000 included VAT at 5%. Calculate how much the
1 answer
41 views
Which of these contractors would be exempt from CWHSSA?
A. A contractor with contracts worth less than $100,000 B. A contractor
1 answer
153 views
I am doing on a project on Building Home Depot. how would I go to found the cost, construction engineer, roofing contractor,
1 answer
asked by
jimmy
8,255 views
A contractor is adding a back porch on to a houseThe porch needs to hold 20 people and furniture that weighs 250 The contractor
1 answer
45 views
A contractor is adding a back porch on to a house. The porch needs to hold 20 people and furniture that weighs 250 lb. The
1 answer
46 views
A contractor is adding a back porch on to a house. The porch needs to hold 20 people and furniture that weighs 250 lb. The
1 answer
44 views
A contractor is adding a back porch on to a house. The porch needs to hold 20 people and furniture that weighs 250 lb. The
1 answer
44 views