write up an estimate for installing plumbing lines to hook into city water. 202 feet of plumbing lines and trench digging through 20' of concrete slab with labor and materials for $ 2,348.00 contractor is Odom's Plumbing and Electric. customer Ernest Goodman at 1306 Fleetwood Rd

1 answer

Estimate for Installing Plumbing Lines for Hooking into City Water

Customer: Ernest Goodman
Address: 1306 Fleetwood Rd

Contractor: Odom's Plumbing and Electric

Description:
The project requires installing plumbing lines to connect to the city water supply. The total length of plumbing lines needed is approximately 202 feet. Trench digging through a 20-foot concrete slab is also necessary.

Estimated Cost Breakdown:

1. Labor:
- Trench digging and excavation labor: $X
- Plumbing line installation labor: $X

2. Materials:
- Plumbing pipes: $X
- Connectors and fittings: $X
- Concrete cutting equipment: $X
- Backfill material: $X

Total Estimated Cost: $2,348.00

Note: Please keep in mind that the prices mentioned above are estimations and subject to change based on the actual requirement and market prices at the time of the project execution.

If you have any further questions or if there are additional details you would like to provide, please do not hesitate to contact Odom's Plumbing and Electric for further assistance.