Which possible solution would have the lowest initial cost?
A. build the mall on an area already cleared but on the other side of town
B. refuse to grant a permit for construction or renovation of a mall
C. build a smaller shopping center
D. renovate an existing mall using recycled materials
1 answer
C. build a smaller shopping center