1. Start by driving or drilling the primary pile into the ground to the desired depth.
2. Insert the secondary pile into the primary pile, ensuring that there is a tight fit between the two piles.
3. Pour concrete or grout into the space between the primary and secondary piles to create a strong bond.
4. Repeat the process for additional layers of piles, if needed.
5. Finish by capping the top of the composite pile with a pile cap or header beam to distribute the load evenly across all layers.