The cosat C, in dollars, of operating a concrete-cutting machine is modelled by C=2.2n^2-66n+655, where n is the number of minutes the machine is run. How long must trhe machine run for the operating cost to be at a minimum? What is the4 minimum cost?

Similar Questions
    1. answers icon 1 answer
    1. answers icon 1 answer
  1. Use the table to answer the question.Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
    1. answers icon 8 answers
  2. Use the table to answer the question.Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
    1. answers icon 1 answer
more similar questions