if a section of concrete is poured for a road and the engineer leaves no gap between sections poured before and after the section in question , what will happen to concrete if the temperature varies from 0 C to 40 C ? Assume that the initial temperature of the pouring was 17 C.
Any ideas? I don't know much about concretes, help please, thank u