Determine the surface (m2) occupied by 120 kWpk of CIS modules that have an efficiency of 8.8% at 1000 W / m2. if it is known that c-Si modules with an efficiency of 15% (in STC conditions) require 20 m2 / kWpk when arranged on the ground with the appropriate row spacings.