Appleseed, a tech company, spends a fixed cost of $1500 to manufacture the wristbands of their new Appleseed Watch, plus $100 per unit manufactured.
What is the slope of the line?
1 answer
The slope of the line represents the variable cost per unit manufactured. In this case, the variable cost is $100 per unit. Therefore, the slope of the line is 100.