A solar energy project is expected to have capital costs of $995,000, average yearly operating costs of $175,000, and a lifetime of 25 years. If the total production during the lifetime of the project is 89,500,000 kWh, what is the levelized cost of energy (LCOE)?(1 point)
Responses

$0.77 per kWh
$0.77 per kWh

$0.06 per kWh
$0.06 per kWh

$0.07 per kWh
$0.07 per kWh

$0.60 per kWh

1 answer

The correct answer is:
$0.07 per kWh

To calculate the Levelized Cost of Energy (LCOE), you need to add up all the costs over the lifetime of the project and then divide by the total amount of kWh produced.

Total Costs = Capital Costs + (Operating Costs * Lifetime)
Total Costs = $995,000 + ($175,000 * 25)
Total Costs = $995,000 + $4,375,000
Total Costs = $5,370,000

LCOE = Total Costs / Total Production
LCOE = $5,370,000 / 89,500,000 kWh
LCOE = $0.06 per kWh

Therefore, the LCOE is $0.06 per kWh.
Similar Questions
  1. Alternative Energy Resources Quick Check1 of 31 of 3 Items Question Why might a company decide against using hydroelectric
    1. answers icon 5 answers
  2. Alternative Energy Resources Quick Check1 of 31 of 3 ItemsPause Question Why is solar energy a viable alternative energy
    1. answers icon 1 answer
  3. The Climate System Quick Check2 of 52 of 5 Items Question Which explains the differences in the distribution of solar energy on
    1. answers icon 7 answers
  4. Resources Quick Check1 of 51 of 5 Items Question Which statement best summarizes an opportunity that exists with transitioning
    1. answers icon 9 answers
more similar questions