Asked by Tim

a) On the Acme W&W company production line, parts have to be transported 100 m by conveyor belt to a machine area. The parts move at a constant speed of 2.5 m/s. How much time does it take to move a part 100 m?

b) On the same conveyor belt as described in problem a), the part must slow down to 0.2 m/s over a distance of 0.9 m once it reaches the machine area. The original speed was 2.5 m/s. What is the average acceleration while slowing down? How much time does it take to slow down?

c) When leaving the machine area described in problems a and b, the part reverses direction and starts with a velocity of 0.2 m/s. It is accelerated at 1.5 m/s^2 for its journey back a distance of 5m. How long does it take the part to travel the 5m distance? What is the final velocity of the part?

Show steps please!

Thank you!

Answers

There are no human answers yet.
There are no AI answers yet. The ability to request AI answers is coming soon!

Related Questions