The reasonable graph of the function rule would be:
Image with alt text: The first quadrant of a graph is shown. The horizontal axis is labeled hours h and it goes from 0 to 14. The vertical axis is labeled cost c and it goes from 0 to 120. Points are plotted at left parenthesis 0 comma 50 right parenthesis, left parenthesis 5 comma 87.5 right parenthesis, and left parenthesis 10 comma 125 right parenthesis. A line is drawn starting at left parenthesis 0 comma 50 right parenthesis, passing through all points, and ending at left parenthesis 10 comma 125 right parenthesis.
A magician charges $50.00 for a visit and an additional $7.50 for each hour he performs. The function rule C = 7.50h + 50.00 describes the relationship between the number of hours h and the total cost of the visit C. If the magician will only visit a maximum of 8 hours, what is a reasonable graph of the function rule? (1 point) Responses The horizontal axis is labeled hours h and it goes from 0 to 14. The vertical axis is labeled cost c and it goes from 0 to 120. Points are plotted at left parenthesis 0 comma 50 right parenthesis, left parenthesis 5 comma 87.5 right parenthesis, and left parenthesis 10 comma 125 right parenthesis. A line is drawn starting at left parenthesis 0 comma 50 right parenthesis, passing through all points, and ending at left parenthesis 10 comma 125 right parenthesis. Image with alt text: The first quadrant of a graph is shown. The horizontal axis is labeled hours h and it goes from 0 to 14. The vertical axis is labeled cost c and it goes from 0 to 120. Points are plotted at left parenthesis 0 comma 50 right parenthesis, left parenthesis 5 comma 87.5 right parenthesis, and left parenthesis 10 comma 125 right parenthesis. A line is drawn starting at left parenthesis 0 comma 50 right parenthesis, passing through all points, and ending at left parenthesis 10 comma 125 right parenthesis. The horizontal axis is labeled hours h and it goes from 0 to 14. The vertical axis is labeled cost c and it goes from 0 to 120. Points are plotted at left parenthesis 2 comma 65 right parenthesis, left parenthesis 5 comma 87.5 right parenthesis, and left parenthesis 8 comma 110 right parenthesis. A line is drawn starting at left parenthesis 2 comma 65 right parenthesis, passing through all points, and ending at left parenthesis 8 comma 110 right parenthesis. Image with alt text: The first quadrant of a graph is shown. The horizontal axis is labeled hours h and it goes from 0 to 14. The vertical axis is labeled cost c and it goes from 0 to 120. Points are plotted at left parenthesis 2 comma 65 right parenthesis, left parenthesis 5 comma 87.5 right parenthesis, and left parenthesis 8 comma 110 right parenthesis. A line is drawn starting at left parenthesis 2 comma 65 right parenthesis, passing through all points, and ending at left parenthesis 8 comma 110 right parenthesis. The horizontal axis is labeled hours h and it goes from 0 to 14. The vertical axis is labeled cost c and it goes from 0 to 120. Points are plotted at left parenthesis 0 comma 50 right parenthesis, left parenthesis 4 comma 80 right parenthesis, and left parenthesis 8 comma 110 right parenthesis. A line is drawn starting at left parenthesis 0 comma 50 right parenthesis, passing through all points, and ending at left parenthesis 8 comma 110 right parenthesis. Image with alt text: The first quadrant of a graph is shown. The horizontal axis is labeled hours h and it goes from 0 to 14. The vertical axis is labeled cost c and it goes from 0 to 120. Points are plotted at left parenthesis 0 comma 50 right parenthesis, left parenthesis 4 comma 80 right parenthesis, and left parenthesis 8 comma 110 right parenthesis. A line is drawn starting at left parenthesis 0 comma 50 right parenthesis, passing through all points, and ending at left parenthesis 8 comma 110 right parenthesis. The horizontal axis is labeled hours h and it goes from 0 to 14. The vertical axis is labeled cost c and it goes from 0 to 120. Points are plotted at left parenthesis 0 comma 50 right parenthesis, left parenthesis 4 comma 80 right parenthesis, and left parenthesis 8 comma 110 right parenthesis. A line is drawn starting at left parenthesis 0 comma 50 right parenthesis, passing through all points, and extending off the graph to the right. Image with alt text: The first quadrant of a graph is shown. The horizontal axis is labeled hours h and it goes from 0 to 14. The vertical axis is labeled cost c and it goes from 0 to 120. Points are plotted at left parenthesis 0 comma 50 right parenthesis, left parenthesis 4 comma 80 right parenthesis, and left parenthesis 8 comma 110 right parenthesis. A line is drawn starting at left parenthesis 0 comma 50 right parenthesis, passing through all points, and extending off the graph to the right. Skip to navigation
3 answers
answer in abcd format
C - The horizontal axis is labeled hours h and it goes from 0 to 14. The vertical axis is labeled cost c and it goes from 0 to 120. Points are plotted at left parenthesis 0 comma 50 right parenthesis, left parenthesis 5 comma 87.5 right parenthesis, and left parenthesis 10 comma 125 right parenthesis. A line is drawn starting at left parenthesis 0 comma 50 right parenthesis, passing through all points, and ending at left parenthesis 10 comma 125 right parenthesis.