A garden shed is 6m long and 4m wide. A path 1.5 m wide and 10 cm deep is going to be made around the shed. What is the volume of concrete needed to lay the path?
1 answer
((6+3)(4+3)-(6*4))(0.1) = 3.9 m^3
1 answer