A factory produces bicycles at a rate of 100+0.4t2−0.7t bicycles per week (t in weeks). How many bicycles were produced from day 15 to 28?
Hint: the lower limit of integration should be the integer number of weeks preceding day 15, i.e. a=2, and the final answer should be an integer number of bicycles.