A crate is dragged 3 meters along a smooth level floor by a 30 N force, applied at 25° to the floor. Then, it is pulled 4 meters up a ramp inclined at 20° to the horizontal, using the same force. Then, the crate is dragged a further 5 meters along a level platform using the same force again. Determine the total work done in moving the crate.