A construction crew pulls up an 87.5 kg load using a rope thrown over a pulley and pulled by an electric motor. They lift the load 15.5 m and it arrives with a speed of 15.6 m.s having started from rest. Assume that acceleration was not constant.

How much work was done by the motor?

1 answer

Potential Energy change PLUS kinetic energy change