A company installs different POS computer systems. POS system A requires two hours to configure and one hour for assemble. POS B requires three hours to configure and one hour to assemble. POS C requires two hours to configure and two hours to assemble. The company has up to 100 labor hours for configure and 800 labor hours for assemble each week. If the profit of POS systems A, B, and C is $700, $ 800, and $1000 respectively how many of each system should be installed each week to maximize profit? What is the maximum profit each week? this has to be set up using the simplex method