A bicycle builder makes two models. The basic model requires 2 hours of frame construction, 4 hours of assembly, and 1 hour of finishing. The deluxe model requires 3 hours of frame construction, 3 hours of assembly, and 2 hours of finishing. Each day 36 hours are available for frame construction, 40 hours for assembly, and 20 hours for finishing. If the profit on the basic model is $100 and on the deluxe model is $150, how many of each should be made to maximize the profit?