A 30kN load is hoisted through a height of 70m in 5 minutes .calculate
1.the work done in one minute
1 answer
30 kN * 70 m * (1 min / 5 min) = ? Joules
Ask a New Question
or
answer this question
.
Similar Questions
calculate work done using machine to raise a load of 10kg through height of 2m and effenciency is 70%
1 answer
A block and tackle system of 5 pulley is used to raise a load of 500N steady through a height of 20m the work done against
13 answers
The efficiency of a machine is 80% calculate the work done by a person using the machine to raise a load of 300kg through a
7 answers
a block and tackle system of pulleys consisting of 5 pulleys is used to raise a load of 500N through a height of 12m. if the
1 answer
more similar questions