Question
A company's predetermined overhead rate is $19.00 per direct labor hour and its direct labor wage rate is $16.00 per hour. Job A100 direct maerials cost is $280 and Direct Labor $240.
1. What is the total manufacturing cost assigned to Job A100?
2. If Job A100 consists of 70 units, what is the average cost assigned to each unit included in the job?
1. What is the total manufacturing cost assigned to Job A100?
2. If Job A100 consists of 70 units, what is the average cost assigned to each unit included in the job?
Answers
Related Questions
The Seattle Company allocates overhead based on a predetermined overhead rate of $8.00 per direct la...
A Corporation uses a predetermined overhead rate of $23.90 per direct labor hour. This predetermined...
Raw materials$ 14.00 Direct labor (2 direct labor hours × $8.00 per hour)16.00 Manufacturing overhea...