Duplicate Question
The question on this page has been marked as a duplicate question.
Original Question
Aki's Bicycle Design has determined that when x hundred bicycles are built, the average cost per bicycle =0.9x^2-1.7x+10.861, w...Asked by Becky
Aki's Bicycle Design has determined that when x hundred bicycles are built, the average cost per bicycle =0.9x^2-1.7x+10.861, when C(x) is in hundreds of dollars. How many bicycles should the shop build to minimize the average cost per bicycle?
C(x)=0.9x^2-1.7x+10.861 =
C(x)=0.9(x^2-1.889x)+10.861=
My question is how do they come up with the 1.889 in the equation?
For Further Reading
* algebra - drwls, Thursday, March 6, 2008 at 4:44am
They are using the method of "completing the square" and may be trying to get a perfect square inside the parentheses.
-0.9 x 1.88888... and -1.7 are the same thing. They rounded off the the 1.88888.. to 1.889.
With a complete square inside parentheses, C(x) becomes
0.9(x^2 - 1.889x + 0.8920) + 10.861 - 0.8028
= 0.9(x- 0.9445)^2 + 10.058
You get minimum average cost when x = .9445
Okay, that makes sense, but now where do you get the 0.8920 in the equation from?
C(x)=0.9x^2-1.7x+10.861 =
C(x)=0.9(x^2-1.889x)+10.861=
My question is how do they come up with the 1.889 in the equation?
For Further Reading
* algebra - drwls, Thursday, March 6, 2008 at 4:44am
They are using the method of "completing the square" and may be trying to get a perfect square inside the parentheses.
-0.9 x 1.88888... and -1.7 are the same thing. They rounded off the the 1.88888.. to 1.889.
With a complete square inside parentheses, C(x) becomes
0.9(x^2 - 1.889x + 0.8920) + 10.861 - 0.8028
= 0.9(x- 0.9445)^2 + 10.058
You get minimum average cost when x = .9445
Okay, that makes sense, but now where do you get the 0.8920 in the equation from?
Answers
Answered by
drwls
If you understand the subject of completing the square, you should know that the constant term has to be the square of half of the coefficient of x,
(1.889/2)^2. So, that constant had to be added inside the parentheses and subtracted somewhere else (after being multipled by 0.9)
(1.889/2)^2. So, that constant had to be added inside the parentheses and subtracted somewhere else (after being multipled by 0.9)
Answered by
Becky
Thank you very much. I am not very good at Algebra, but maintaining an "A". I want to totally understand how the numbers are arrived at and then it makes complete sense.
Answered by
drwls
You are doing the right thing. Once you understand the logic of each step, it becomes easier to do them yourself. Otherwise, it's like watching rabbits pulled out of a hat in a magic show.
There are no AI answers yet. The ability to request AI answers is coming soon!