A chemical engineer designed a 625 ft long tailings channel to have a rhombus cross-section that is 9.5 ft deep, with walls sloping at an acute angle of 44„a.

A contractor placed a bid to excavate the canal at $195/cubic yard plus 20% profit. What was the bid?
13 years ago

Answers

Related Questions

An engineer designed a 620 ft long water canal to drain a rainwater detention pond. It is to have a... a chemical engineer placed 1.520 g of a hydorcarbon in the bomb of a calorimeter. The bomb was imme... You are a Chemical engineer, trying to synthesize N2H4(l). Your boss suggests that you try to synth... A chemical engineer calculated that 15.0 mol H2 was needed to react with excess N2 to prepare 10.0 m... Which chemical engineer, physician, and NASA astronaut was the first black woman to travel to space?... An engineer designed a scale model of a 1940 Ford pickup truck using a scale in which 2 inches repre... An engineer designed a scale model of a 1940 Ford pickup truck using a scale in which 2 inches repre... A chemical engineer has an annual income of $164,000. The income tax the chemical engineer has to... A chemical engineer has tested 56 water samples. These samples make up 25% of the total number of sa...
Ask a New Question
Archives Contact Us Privacy Policy Terms of Use