<b>A contractor requires a cement mix that is 70% sand and 30% cement.
He has 700 kg of a cement mix that is 80% sand and 20% cement.
How much cement should he add so that he gets the required mix?</b>
My set up:
required mix = (S)(.7) + (C)(3)
700kg = (S)(.8) + (C+X)(.2)
Is this even correct?
He has 700 kg of a cement mix that is 80% sand and 20% cement.
How much cement should he add so that he gets the required mix?</b>
My set up:
required mix = (S)(.7) + (C)(3)
700kg = (S)(.8) + (C+X)(.2)
Is this even correct?
Answers
C / (S+c) = 0.3.
C = 0.8 * 700kg = 560kg.
C / (560+C) = 0.3,
C = 168 + .3C,
C - 0.3C = 168,
0.7C = 168,
C = 240kg.
C = 0.8 * 700kg = 560kg.
C / (560+C) = 0.3,
C = 168 + .3C,
C - 0.3C = 168,
0.7C = 168,
C = 240kg.
Related Questions
Mr Kim mix cement and sand to make a mixture.He uses 2 pails of cement for every 5 pails of sand.
(...
concrete is to be mixed using cement and sand into the ratio 2:5. how much sand will be required to...
Concrete is made from sand and cement. 20kg of concrete containe 15kg of sand. Find the ratio of san...
A construction worker worker mixes cement and sand to make motar. He always uses the same ratio of c...