A factory needs two raw materials, say, A and B. The probability of having an adequate supply of material A is 0.94, whereas the probability of having an adequate supply of material B is 0.96. A study shows that the probability of a shortage of both A and B is 0.02. What is the probability that the factory has a shortage of either material A or B?

(Show full working)
14 years ago

Answers

MathMate
A=0.06
B=0.04
A∩B=0.02
by the inclusion/exclusion principle,
A∪B=(0.06+0.04)-0.02=?
14 years ago

Related Questions

CAN SOMEONE TELL ME HOW MATERIAL AND CONVERSION IS BROKEN UP IN THIS PROBLEM thanks so much PR... ¿Qué materia te gusta más?" "Me gusta más la clase de geometría. Es _____ de todas." a. la clase me... 5. The products are the materials used in the reaction.- T? 28. Alloys are a. elements b. compo... Suppose you have enough material for 60 feet of fencing. With this material you want to build the l... Jim has 400 ft of fence material and needs to enclose an area of 10,000 square feet for his garden a... The warmer a particular material is the _______________________ the particles are moving. 1.4 the productivity of materials are? The use of synthetic materials has pros and cons. Do you think the pros of using synthetic materi... What are some composite materials What is the propagation material/methods Of every each fruit: passion fruit, pineapple,mango, avoc...
Ask a New Question
Archives Contact Us Privacy Policy Terms of Use