Asked by ash
solve this linear programming problem;
A chain saw requires 4 hours of assembly and a wood chipper 6 hours. A maximum of 48 hours of assembly time is available. The profit is $150 on a chain saw and $220 on a chipper. How many of each should be assembled for maximum profit??
Thanks in advance guys!! =]
A chain saw requires 4 hours of assembly and a wood chipper 6 hours. A maximum of 48 hours of assembly time is available. The profit is $150 on a chain saw and $220 on a chipper. How many of each should be assembled for maximum profit??
Thanks in advance guys!! =]