Short answer: the hardest part is usually the trade-off between achieving the required magnetic field and keeping the coil within safe thermal and mechanical limits — i.e., designing a coil and core that produce the field you want without overheating, saturating the core, or exceeding the power-supply/current constraints.

Why that is hard (common specific difficulties)
- Magnetic design vs. power: getting the required ampere‑turns (N·I) can demand high current or lots of turns. High current heats the wire (I^2R losses); many turns increase resistance and voltage. Balancing N, I, wire gauge, and power supply is tricky.
- Core selection and saturation: choosing a core material with high permeability helps reduce the needed ampere‑turns, but ferromagnetic cores saturate (Bsat) and their effective permeability depends on geometry and any air gaps.
- Thermal management: calculating heating, choosing insulation class, and designing cooling (natural convection, forced air, or water) is often underestimated. Continuous duty vs. intermittent duty changes everything.
- Mechanical/assembly challenges: tight uniform winding, good insulation between layers, securing the windings against large magnetic forces, and avoiding shorted turns are all fiddly and failure-prone.
- Measurement and verification: getting accurate field measurements (calibrated Hall probes or gaussmeters), interpreting fringe fields, and comparing test results to models requires care and sometimes more instrumentation than expected.
- Safety and protection: preventing shorts, thermal runaways, and ensuring safe testing procedures (fuses, current limiting) is essential and often constrains the design.

Concrete technical points and checks people miss
- Use Ampère’s law approximations: for a long solenoid B ≈ μ0·N·I / L (air core). For iron-core designs you must account for core reluctance and possible saturation.
- Compute coil resistance R = ρ·(length of wire) / (wire cross-section) so you can estimate power P = I^2R and required supply voltage V = I·R.
- Check wire ampacity and insulation class; if I is high, choose thicker wire or multiple parallel runs.
- Estimate temperature rise and duty cycle (thermal time constant); if continuous operation is required, plan active cooling.
- If using AC or fast switching, account for eddy currents and use laminated cores or powdered iron, or design for an air core.
- Start low and test incrementally: ramp current slowly while monitoring temperature and field.

Practical tips
- Simulate first (FEMM is free and great for magnets) to predict fields, flux paths, and saturation.
- Hand-wind tightly or use a bobbin; pot or varnish the coil if needed to prevent movement.
- Measure field with a calibrated Hall probe at the location of interest, and measure coil resistance and temperature during runs.
- Add current limiting or a lab power supply with CC mode and a thermal sensor/fuse for safety.
- If you want a strong field and continuous duty, use parallel conductors or water-cooled hollow conductors.

If you want, tell me the target field, volume/geometry, supply limits (voltage/current), and whether it’s DC or AC — I can walk through calculations and a recommended core/wire/cooling choice.