Ask a New Question

Question

Given the ensuing well drilling data, answer the following. [Reference: #4.78, page 172]

• .30 (30%) probability of a productive well absent test information
• Pre-drilling ballistics test ‘s affirmative result correctly predicts a productive well .70 of the time
• Pre-drilling ballistics test’s negative result correctly predicts a non-productive well .80 of the time
17 years ago

Answers

sophia
oops
17 years ago

Related Questions

Given the ensuing well drilling data, answer the following. • .30 (30%) probability of a produc... 15. Given ensuing information, determine the least cost and the least cost mix of on- and off-shore... Given ensuing information, determine the least cost and the least cost mix of on- and off-shore pipe... The drilling of a jackhammer was measured at 131dB. The sound of whispering was measured at 28dB. (N... The drilling of a jackhammer was measured at 131dB. The sound of whispering was measured at 28dB.... A drilling machine should be set to 250 rpm .the nearest speed available on the machine is 368 rpm .... Instead of drilling in the caribou habitat, what does the author propose as an alternative? a. Imp... A water well drilling rig has dug to a height of -60 feet after one full day of continuous use. (24... The benefits of drilling appear large enough that is not important to try to reduce the cost. Is thi... Oil drilling has a diverse and widespread effect on the environment. The infrastructure required to...
Ask a New Question
Archives Contact Us Privacy Policy Terms of Use