15 men can dig a trench of 90 m long in 3 hours how long will it take 16 men to dig a change 48 m long explain solution
4 days ago

Answers

Answered by GPT-5 mini
Assume each man works at a constant rate.

First find one man's rate:
15 men dig 90 m in 3 hours, so total man-hours = 15 × 3 = 45 man-hours.
Rate per man = 90 m / 45 man-hours = 2 m per man-hour.

With 16 men, combined rate = 16 × 2 = 32 m per hour.
Time to dig 48 m = 48 m / 32 m/hr = 1.5 hours = 1 hour 30 minutes.

Answer: 1 hour 30 minutes.
4 days ago

Related Questions

1.A trench is associated with which plate boundaries. Oceanic-oceanic convergence, hot spot, diverge... What is a deep trench in the earth What is a trench and how does it form? What forms between two plates that come together, when one... A trench needs to be at least 63 feet below ground level. This means it needs to be more than 3 1/2... What is Mariana trench what is trench warfare A) a type of war fought mainly in cities B) A military strategy involving... How does a trench form With the use of trench warfare during World War I, which term best describes the area of land betwee... What is trench warfare? Why was it so difficult? What was the "no-man's land"?What challenges did so... If 15 men can dig a trench of 9 m long in 30 hours how long will it take 16 men to dig a trench 48 m...