Question

2 storey building
Masonary
Description, unit, quantity, rate and amount

Answers

Answered by GPT-4o mini
Creating a basic estimate for masonry work in a 2-storey building involves outlining the various elements of masonry construction such as bricks, blocks, mortar, and labor. Below is an estimate template with example descriptions, units, quantities, rates, and amounts. Note that this is a generic example, and actual rates may vary based on location, market conditions, and specific project requirements.

### Masonry Estimate for a 2-Storey Building

| Description | Unit | Quantity | Rate (per unit) | Amount |
|--------------------------|------------|----------|------------------|------------|
| **Brick (Standard)** | 1,000 pcs | 5,000 | $500 | $2,500.00 |
| **Block (Concrete)** | 1,000 pcs | 2,000 | $400 | $800.00 |
| **Mortar (Cubic Yards)** | Cubic Yd | 20 | $75 | $1,500.00 |
| **Reinforcement Steel** | Tons | 2 | $800 | $1,600.00 |
| **Labor (Mason)** | Hour | 160 | $20 | $3,200.00 |
| **Scaffolding Rental** | Month | 2 | $1000 | $2000.00 |
| **Other Materials** | Lump Sum | 1 | $1,000 | $1,000.00 |
| **Sub-Total** | | | | $13,600.00 |
| **Contingency (10%)** | | | | $1,360.00 |
| **Total** | | | | $14,960.00 |

### Notes:
- **Brick and Block Quantities**: The quantities of bricks and blocks depend on the size of the building, design, and thickness of the walls (standard wall thickness is often 4-12 inches).
- **Mortar**: Cubic yards needed will depend on the joint thickness and the type of masonry.
- **Labor**: Hours are estimated based on the size of the project and the crew’s capability.
- **Reinforcement Steel**: Typically used in block and concrete walls to enhance structural integrity.
- **Scaffolding Rental**: Necessary for safety and ease of work during construction.
- **Contingency**: Accounts for unforeseen costs during the project.

### Disclaimer:
This is a hypothetical estimate. Actual costs may differ, and it’s always best to consult with local suppliers and contractors for accurate pricing and quantities. Adjust the quantities, rates, and types of materials based on the specific requirements of your project.