Question
A batch of concrete is made by mixing 1 part cement, 2.5 parts sand, and 3.5 parts gravel. How many pounds of sand and gravel are needed to make 300 pounds of cement?
Answers
2.5/7 = x/300 for sand
3.5/7 = x/300 for gravel
In each case, solve for x.
3.5/7 = x/300 for gravel
In each case, solve for x.
I figured it out, and actually you multiply the 2.5 by 300 and then the 3.5 by 300 to get the amount of sand and gravel!!
2.5x300=750. 3.5x300=1,050